SECTION 00 11 13 ADVERTISEMENT FOR BIDS LOGAN FAÇADE IMPROVEMENTS - CITY OF LOGAN, IOWA Notice is hereby given that the Logan City Admin will be accepting sealed bids for the LOGAN FAÇADE …

Posted

SECTION 00 11 13 ADVERTISEMENT FOR BIDS LOGAN FAÇADE IMPROVEMENTS - CITY OF LOGAN, IOWA Notice is hereby given that the Logan City Admin will be accepting sealed bids for the LOGAN FAÇADE IMPROVEMENTS project now on file in the Office of the City Admin . Sealed bids will be received at the Office of the City Admin of the City of Logan, Iowa located at 108 W 4th St., in said City, until 12:00 P.M., Local Time, Wednesday, November 16th, 2022, for the construction of the project, as described in the Construction Documents. Sealed proposals will be opened, and bids tabulated at a public meeting, presided over by the Mayor or his designee, in City Council Chambers in City Hall at 12:00 P.M., Local Time, Wednesday, November 16th, 2022. Bids will be acted upon by the City Council at the hearing scheduled to be held at 6:00 P.M., Local Time, on Monday, November 21st, 2022 at the City Council Chambers in City Hall at 108 W 4th St., Logan, IA. Copies of said Contract Documents are available at the office of the City Admin of Logan for examination by the public. Construction Documents for private use may be viewed or obtained from Curtis Architecture & Design P.C., 3408 Woodland Ave. Suite 302, West Des Moines, Iowa 50266. A refundable deposit of Eighty dollars ($80.00) shall be required for each complete set of documents; which is refundable upon receipt of the Drawings and Specifications, if the Construction Documents are returned in good condition within ten (10) days from the date of letting. Partial or separated documents will not be provided. Electronic documents may be obtained for no cost by request via email from Rod Curtis (Rod.curtis@curtisarchitecture.com) or (jacob@curtisarchitecture.com) with Curtis Architecture & Design P.C. A non-refundable postage and handling fee of Twenty-five dollars ($25.00) will be added for each set of Construction Documents to be mailed. Special arrangements must be made for overnight mail delivery. The project will include restoration of the north, east, and west facades of a small, once-story, brick building in downtown Logan, IA. Work will include, but not be limited to: new alumn. Clad wood window systems, tuckpointing, brick infill, new clad entry doors & hardware, new electrical and lighting, and concrete work. Bidder is encouraged to attend pre-bid conference at 8:00 A.M. local time on Tuesday, October 25th, 2022, at the City Council Chambers, 108 W 4th St., Logan, IA. A tour of the included buildings will follow the conference. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful Bidder will enter into a contract for the work bid upon, and will furnish after Award of Contract a corporate surety bond, in a form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to 5% of the amount of the Contract. The Bidder’s security shall be in the amount fixed in the Instruction to Bidders, and shall be in the form of a cashier’s check or a certified check drawn on an FDIC-insured bank in Iowa, or on an FDIC-insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa, or chartered under the laws of the United States; or a bid bond on the form provided in the Contract Documents with corporate surety satisfactory to the Jurisdiction. The bid shall contain no condition except as provided in the Specifications. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. The Contractor shall NOT include sales or use taxes in the bid. Pursuant to Iowa Code and Iowa Administrative Code, the Contractor will be authorized to purchase building materials that will be incorporated into real property on this project tax-free. Iowa Construction Sales Tax Exemption Certificates will be issued by the City, which will authorize suppliers of building materials to sell materials exempt from Iowa sales tax and any applicable local option sales tax and school infrastructure local option sales tax to the entity listed on the certificate. Upon award of the Contract, the successful Contractor will be required to provide project information on the contractor, and each subcontractor and supplier requiring the exemption certificates. Contractor will maintain records identifying the materials purchased sales tax exempt and will maintain records verifying the use of said materials on said improvement. The Contract will be awarded to the lowest responsive, responsible bidder. However, the City reserves the right to reject any or all proposals, re-advertise for new bids, to waive irregularities, and to accept any proposals, which in the opinion of the City Council, is deemed to be in the best interest of the City. The City of Logan reserves the right to defer acceptance of any bid for a period of sixty (60) calendar days after receipt of bids, and no bid may be withdrawn during this period. Each successful Bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its Contract price. Said bond shall be issued by a responsible surety approved by City of Logan, and shall guarantee the faithful performance of the Contract and the terms and conditions therein contained, and shall guarantee the prompt payment of all material and labor, and protect and save harmless the City of Logan from claims and damages of any kind caused by the operations of the Contract. The work on this project shall begin upon receipt of the Notice to Proceed, and be fully completed no later than May 31st, 2023. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per working day will be assessed for each day that the work shall remain uncompleted after the end of the Contract period with due allowance for extension of Contract period due to conditions beyond the control of the Contractor. CDBG Requirements. The work to be performed under this Contract is on a project assisted under a program providing direct Federal financial assistance from the Department of Housing and Urban Development, Community Development Block Grant, and is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701 V. All contractors and subcontractors must be registered with the Iowa Workforce Development and with the Federal SAM database. Prevailing Wages and EEO Requirements. Bidders are advised that all wages are subject to the minimum wages as set forth in a Federal Wage Determination for this project. Bidders are also advised work under this Contract will be required to comply with Labor Standards Contract Provisions and Presidential Executive Order No. 11246. Published upon order of the City Council of Logan, Iowa. Angela Winther, City Admin, Logan, Iowa END OF SECTION 00 11 13 MVTN 11-2-22